Pipe. Fiberglass or stainless steel?

被引:0
|
作者
机构
[1] Britt, Frank
来源
Britt, Frank | 1600年 / 97期
关键词
Filament Wound Pipe - Support Cost - Support Design;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] The heat transfer in the pipe.
    Nusselt, W
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1917, 61 : 0685 - 0689
  • [22] LABORATORY LOAD TESTS ON BURIED REINFORCED THERMOSETTING, THERMOPLASTIC AND STEEL PIPE.
    Howard, Amster K.
    Selander, Carl E.
    1600,
  • [23] WELDING TECHNIQUES USED BY ARC WELDERS TO JOIN MILD STEEL PIPE.
    Ballis, W.L.
    DeHaven, C.
    Welding Journal (Miami, Fla), 1979, 58 (03): : 15 - 21
  • [24] GUIDE TO PLASTIC PIPE.
    Cunningham, Ernest R.
    Plant Engineering (Barrington, Illinois), 1976, 30 (25): : 120 - 125
  • [25] Testing of Coated Pipe.
    Hauk, V.
    Meyer, W.
    Schwenk, W.
    Materialpruefung/Materials Testing, 1974, 16 (01): : 6 - 10
  • [26] CEMENT MORTAR LINING OF 20-FT DIAMETER STEEL PIPE.
    Wolfe, James E.
    American Society of Civil Engineers, Transportation Engineering Journal, 1972, 98 (TE4): : 837 - 853
  • [27] DURABILITY OF DRAINAGE PIPE.
    Anon
    1978, (50):
  • [28] FUTURE OF PVC PIPE.
    Heilmayr, Peter F.
    Elektrowaerme International, 1975,
  • [29] HIGH FREQUENCY INDUCTION WELDED HIGH-STRENGTH STEEL PIPE.
    Tanaka, Norio
    Iwasaki, Toshio
    Watanabe, Norio
    Tamura, Yasuo
    Nippon Steel Technical Report, 1986, (30): : 43 - 49
  • [30] INSTALLATION OF FIBERGLASS PIPE
    Schrock, B.Jay
    1978, 104 (06): : 835 - 846