STEELMAKING FOR A CONTINUOUS CASTING OPERATION.

被引:0
|
作者
Sigler, Thomas I.
McLouth Steel Corp, Trenton
Turek, Joseph R.
机构
来源
Industrial Heating | 1974年 / 41卷 / 10期
关键词
FURNACES; ELECTRIC - STEEL - Continuous Casting;
D O I
暂无
中图分类号
学科分类号
摘要
The equipment described includes five 110-ton basic oxygen vessels, two 200-ton electric furnaces and four curved mold single strand casting machines. Production rate is 2,200,000 tons per year of 12-in. thick slabs in steel grades 1008 through 1035. Low alloy carbon grades are also cast into slabs. Carbon steel ingots are not made at McLouth; stainless steels are poured into ingot molds.
引用
收藏
页码:28 / 29
相关论文
共 50 条
  • [21] Application of neural network in steelmaking and continuous casting: A review
    Zhang, Chaojie
    IRONMAKING & STEELMAKING, 2024,
  • [22] Production scheduling in a steelmaking-continuous casting plant
    Pacciarelli, D
    Pranzo, M
    COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (12) : 2823 - 2835
  • [23] Electro-magnetic Technology in Steelmaking and Continuous Casting
    Kullander, S.
    South African Mechanical Engineer, 1996, 46 (07):
  • [24] Study on Dynamic Scheduling Stimulation of Steelmaking and Continuous Casting
    Liu, Wei
    Sun, Liangliang
    Qi, Yutao
    Zheng, Binglin
    Chai, Tianyou
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 3419 - 3423
  • [25] CONSTRUCTION AND OPERATION OF A NEW CONTINUOUS STEELMAKING FACILITY
    NAKAGAWA, R
    YOSHIMATSU, S
    IWASAKI, T
    FUJIKAWA, Y
    IRON AND STEEL ENGINEER, 1984, 61 (06): : 57 - 64
  • [26] A Prediction Method for Abnormal Condition of Scheduling Plan with Operation Time Delay in Steelmaking and Continuous Casting Production Process
    Yu, Shengping
    ISIJ INTERNATIONAL, 2013, 53 (06) : 1028 - 1041
  • [27] Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown
    Long, Jianyu
    Zheng, Zhong
    Gao, Xiaoqiang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (11) : 3197 - 3216
  • [28] SIMULATING SCHEDULE OPTIMIZATION PROBLEM IN STEELMAKING CONTINUOUS CASTING PROCESS
    Yang, Z.
    Qiu, H-L
    Luo, X-W
    Shen, D.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2015, 14 (04) : 710 - 718
  • [29] The Study of Ladle Scheduling for Steelmaking and Continuous Casting Production Process
    Wang, Xiuying
    Yang, Aiguang
    Yu, Shengping
    Liu, Wei
    Zhang, Zhiyu
    PROCEEDINGS OF FIRST INTERNATIONAL CONFERENCE OF MODELLING AND SIMULATION, VOL V: MODELLING AND SIMULATION IN MECHANICS AND MANUFACTURE, 2008, : 172 - 177
  • [30] ROLE OF SLAGS IN STEELMAKING CONTINUOUS CASTING MOLD FLUXES.
    McCauley, W.L.
    Apelian, D.
    I & SM, 1983, 10 (11):