共 50 条
- [41] Prime contractor manages pilot section of Nuernberg-Ingolstadt line Railw Gaz Int, 10 (667-668):
- [42] The Impact of a Client Contractor Health and Safety (H&S) Programme on Contractor H&S Performance CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 996 - 1002
- [43] Influence of the contractor's payment method on the economic effectiveness of the construction project from the contractor's point of view OPEN ENGINEERING, 2018, 8 (01): : 562 - 570
- [45] The stability of pilot tunnels at Xiaolangdi multipurpose dam project GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 2169 - 2175
- [47] Contractor's viewpoint on painting chemical plants Journal of Protective Coatings and Linings, 1991, 8 (03): : 46 - 50