共 50 条
- [21] Risk assessment in process of LNG terminal design RELIABILITY, RISK AND SAFETY: THEORY AND APPLICATIONS VOLS 1-3, 2010, : 2063 - 2068
- [23] SIL verification and re-validation for LNG receiving terminal in operation Huagong Xuebao/CIESC Journal, 2015, 66 : 271 - 278
- [24] 3 YEARS OF OPERATION OF PYEONG-TAEK LNG RECEIVING TERMINAL NINTH INTERNATIONAL CONFERENCE ON LIQUEFIED NATURAL GAS, VOLS 1 AND 2, 1989, : 535 - 546
- [25] ENGINEERING AND CONSTRUCTION OF LNG RECEIVING TERMINAL FACILITIES AND LPG PLANT. Nippon Steel Technical Report, 1986, (28): : 69 - 73
- [26] Optimization analysis of booster-recondensation system in LNG receiving terminal Huagong Xuebao/CIESC Journal, 2015, 66 : 418 - 424
- [28] Simulation method for risk assessment in LNG terminal design SUSTAINABLE MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2012, : 755 - 761
- [29] This time is different. The globalization of uncertainty ROMANIAN JOURNAL OF COMMUNICATION AND PUBLIC RELATIONS, 2020, 22 (01): : 129 - 136
- [30] Study and economic evaluation on the process of calorific value adjustment in the LNG receiving terminal Open Pet. Eng. J., (226-235): : 226 - 235