REPORT ON CONSTRUCTION OF INNOSHIMA BRIDGE (PART 2).

被引:0
|
作者
Kumagai, Atsushi
Nakagaki, Ryoji
Kaneyoshi, Masakatsu
Tanaka, Hiroshi
Inohara, Shigeru
Ogata, Kazuhiko
Yamai, Shunsuke
Imai, Tsutomu
机构
来源
Hitachi Zosen Technical Review | 1986年 / 47卷 / 1-2期
关键词
D O I
暂无
中图分类号
TU [建筑科学]; U [交通运输];
学科分类号
08 ; 0813 ; 0823 ;
摘要
Hitachi Zosen completed the construction of the Innoshima-Bridge ordered from Honshu-Shikoku Bridge Authority with great success in December 1983. This paper gives technical details and special remarks to the construction of stiffening girder following the previous paper which explains the construction of cable anchor frames and towers for this bridge.
引用
收藏
页码:53 / 76
相关论文
共 50 条
  • [41] BRIDGE CONSTRUCTION SURVEYING
    BURGAN, RW
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO2): : 105 - 111
  • [42] Tendencies in bridge construction
    Natterer, J
    5TH WORLD CONFERENCE ON TIMBER ENGINEERING, VOL 2, PROCEEDINGS, 1998, : 100 - 107
  • [43] Digital bridge construction
    Drossou, O
    Fücks, R
    INTERNATIONALE POLITIK, 2006, 61 (01): : 107 - 111
  • [44] Construction of the Ikuchi Bridge
    Asahi, Kazuho
    Miyashita, Chikara
    Fujiwara, Tohru
    1600, (31):
  • [45] Bridge Construction Equipment
    Sanchez, Marcos
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2014, 167 (04) : 340 - 340
  • [47] THE CONSTRUCTION OF KYLESKU BRIDGE
    MARTIN, JM
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 317 - 342
  • [48] Innovations in Bridge Construction
    Friedrich, Heinz
    Empelmann, Martin
    Hamm, Stephan
    Freundt, Ursula
    Schnellenbach-Held, Martina
    Butz, Christiane
    Mangerig, Ingbert
    Tusche, Jens
    BETON- UND STAHLBETONBAU, 2013, 108 (04) : 282 - 291
  • [49] Changing (bridge) construction
    Fischer, Oliver
    Beton- und Stahlbetonbau, 2020, 115 (10):
  • [50] Accelerated Bridge Construction
    Azizinamini, Atorod
    JOURNAL OF BRIDGE ENGINEERING, 2020, 25 (12)