共 50 条
- [2] AERODYNAMIC STABILITY OF INNOSHIMA BRIDGE, BOTH DURING CONSTRUCTION AND AFTER COMPLETION BY 2-DIMENSIONAL WIND TUNNEL TEST. 1981, V 42 (N 4): : 14 - 26
- [3] The Franklin Avenue Bridge: Part 2: Analysis, design, and accelerated bridge construction 1600, American Concrete Institute (39):
- [6] Peljesac bridge, Croatia-Part 2: Construction and Assembly BAUINGENIEUR, 2023, 98 (06): : 188 - 196
- [7] ADHAMIYAH BRIDGE, BAGHDAD - PART 2. CONSTRUCTION. Structural Engineer, 1984, 62 A (01): : 18 - 25
- [9] Construction of Yoshima bridge as a part of Honshu-Shikoku bridge NKK Technical Review, 1988, (54): : 8 - 16