REPORT ON CONSTRUCTION OF INNOSHIMA BRIDGE (PART 2).

被引:0
|
作者
Kumagai, Atsushi
Nakagaki, Ryoji
Kaneyoshi, Masakatsu
Tanaka, Hiroshi
Inohara, Shigeru
Ogata, Kazuhiko
Yamai, Shunsuke
Imai, Tsutomu
机构
来源
Hitachi Zosen Technical Review | 1986年 / 47卷 / 1-2期
关键词
D O I
暂无
中图分类号
TU [建筑科学]; U [交通运输];
学科分类号
08 ; 0813 ; 0823 ;
摘要
Hitachi Zosen completed the construction of the Innoshima-Bridge ordered from Honshu-Shikoku Bridge Authority with great success in December 1983. This paper gives technical details and special remarks to the construction of stiffening girder following the previous paper which explains the construction of cable anchor frames and towers for this bridge.
引用
收藏
页码:53 / 76
相关论文
共 50 条
  • [1] CONSTRUCTION OF THE INNOSHIMA BRIDGE.
    Fuse, Yoichi
    Yamagata, Mamoru
    Civil engineering in Japan, 1984, 23 : 72 - 85
  • [2] AERODYNAMIC STABILITY OF INNOSHIMA BRIDGE, BOTH DURING CONSTRUCTION AND AFTER COMPLETION BY 2-DIMENSIONAL WIND TUNNEL TEST.
    UEDA, TOSHIO
    KUMAGAI, ATSUSHI
    1981, V 42 (N 4): : 14 - 26
  • [4] The canal bridge across the elbe - Part 2: design and construction of the approaching bridge
    Meyer, H.
    He, S.
    Stahlbau, 2001, 70 (07) : 425 - 428
  • [5] Assembly as an independent Discipline of Large Steel Bridge Construction (Part 2) Assembly of Steel Bridge Construction
    Pelke, Eberhard
    Kurrer, Karl-Eugen
    STAHLBAU, 2020, 90 (03) : 214 - 226
  • [6] Peljesac bridge, Croatia-Part 2: Construction and Assembly
    Pipenbaher, M.
    BAUINGENIEUR, 2023, 98 (06): : 188 - 196
  • [7] ADHAMIYAH BRIDGE, BAGHDAD - PART 2. CONSTRUCTION.
    Al-Bayah, Ismail I.
    Lee, D.J.
    Structural Engineer, 1984, 62 A (01): : 18 - 25
  • [8] Renovation Rheinvorland-Bridge at Worms: Bridge Construction and Interaction with the Railway Superstructure - Part 2
    Casper, Hans-Joachim
    Eckersberg, Gerald
    Erlenbusch, Bernd
    Fruehauf, Wolfgang
    Knob, Wolfgang
    Sachse, Frank
    STAHLBAU, 2012, 81 (08) : 624 - 631
  • [9] Construction of Yoshima bridge as a part of Honshu-Shikoku bridge
    Okamoto, Tadao
    Shinohara, Toshinobu
    Shimada, Masahiro
    Ishii, Takashi
    Hidekawa, Hitoshi
    Tamai, Hisao
    NKK Technical Review, 1988, (54): : 8 - 16
  • [10] Saale Bridge Beesedau - Part II: Static and construction of the river bridge
    Schmackpfeffer, Heinz
    Gebert, Gregor
    Stahlbau, 2000, 69 (05) : 358 - 372