V-22 engineers told: Work on hydraulics, flight software

被引:0
|
作者
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] V-22 Osprey: back on track
    Newton, J
    AEROSPACE ENGINEERING, 2003, 23 (07) : 7 - 8
  • [32] Amarillo to build V-22 Tiltrotor
    Phillips, EH
    AVIATION WEEK & SPACE TECHNOLOGY, 1998, 149 (06): : 30 - 30
  • [33] Amarillo to build V-22 tiltrotor
    Aviation Week and Space Technology (New York), 1998, 149 (06):
  • [34] V-22 to begin fatigue tests
    Phillips, EH
    AVIATION WEEK & SPACE TECHNOLOGY, 1998, 148 (16): : 67 - 67
  • [35] V-22 Osprey production progresses
    Aerospace Engineering (Warrendale, Pennsylvania), 1998, 18 (05):
  • [36] Titanium casting developed for the V-22
    Goodley, BC
    Caulfield, TJ
    Clor, S
    Furr, CC
    ADVANCED MATERIALS & PROCESSES, 1997, 151 (06): : 43 - 46
  • [37] V-22飞机进驻日本
    涵仁
    现代舰船, 2012, (10) : 43 - 46
  • [38] V-22 slowdown augurs layoffs
    Wall, R
    AVIATION WEEK & SPACE TECHNOLOGY, 2001, 155 (01): : 45 - 45
  • [39] NASA tests V-22 wing
    Phillips, EH
    AVIATION WEEK & SPACE TECHNOLOGY, 1996, 144 (16): : 49 - 49
  • [40] Fixing BIT on the V-22 Osprey
    Westervelt, Kerry
    2006 IEEE Aerospace Conference, Vols 1-9, 2006, : 3646 - +