共 50 条
- [43] COST ANALYSIS AND PROJECT DURATION SHORTENING IN NETWORK PLANNING TECHNIQUE WITH PERT / COST METHOD INTERDISCIPLINARY MANAGEMENT RESEARCH XIII, 2017, 13 : 36 - 50
- [44] Mathematical Programming for Ship Block Construction Planning Based on Network Project Technique EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1629 - 1633
- [47] Fuzzy Analysis of Project Duration in Situations of Risk PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014), 2015, 1648
- [48] An approach to a fuzzy-based decision support system for construction project teams ARTIFICIAL INTELLIGENCE APPLICATIONS IN CIVIL AND STRUCTURAL ENGINEERING, 1999, : 53 - 59
- [50] Construction Safety Monitoring Based on The Project's Characteristic with Fuzzy Logic Approach 3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903