共 50 条
- [41] REFINING THE SOLUTION TO THE PROBLEM OF REACTIVE-POWER COMPENSATION. Power engineering New York, 1984, 22 (06): : 29 - 36
- [44] FIRST ORDER BUILDING BLOCKS AND THEIR APPLICATIONS IN ACTIVE COMPENSATION. Modelling, Measurement and Control A, 1988, 16 (03): : 1 - 11
- [48] Pay without performance: The unfulfilled promise of executive compensation. INDUSTRIAL & LABOR RELATIONS REVIEW, 2006, 59 (04): : 672 - 674
- [49] Dynamic Programming Applied to the Problem of Reactive Load Compensation. Izvestiya Vysshikh Uchebnykh Zavedenii, Elektromekhanika, 1982, (09): : 1065 - 1067
- [50] Separation of Interacting Multivariable Systems by Computerized Interference Compensation. Meres es Automatika, 1975, 23 (01): : 26 - 30