NEW DAM CONSTRUCTION METHOD.

被引:0
|
作者
Dunstan, M.R.H.
机构
来源
Consulting Engineer (London) | 1979年 / 43卷 / 05期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The article describes the background to the current work on the development of rolled concrete for dam construction. The proposed method consists of the formation of the faces of the dam using an offset slip-form paver running on top of the previously compacted hearting concrete. The hearting concrete is placed in layers of uniform thickness compatible with the slip-formed facing unit.
引用
下载
收藏
页码:43 / 44
相关论文
共 50 条
  • [41] The operation of jejunostomy, with a description of a new method.
    Robson, AWM
    LANCET, 1905, 1 : 1488 - 1489
  • [42] New Austrian Combined Tunneling Method.
    Brunner, Anton
    Strassen- und Tiefbau, 1985, 39 (04):
  • [43] NEW PLASMA DIAGNOSTIC CAPACITANCE METHOD.
    Dengra, A.
    Colomer, V.
    Hernandez, M.A.
    1600, (26):
  • [44] CONSTRUCTION OF COMPLEX POLYGONS FOR MEASURING ANTENNA CHARACTERISTICS BY THE COLLIMATOR METHOD.
    KAPLUN, I.V.
    KOLOSOV, YU.A.
    1981, V 35-36 (N 10): : 83 - 89
  • [45] CONSTRUCTION OF THE UNDERGROUND PORTION OF A BUILDING BY THE SUNKEN-SHAFT METHOD.
    Smorodinov, M.I.
    Bereznitskii, Yu.A.
    1986, (23)
  • [46] Adequate Selection of Columns for the Lift-Slab Construction Method.
    Frano, Valdimir
    Inzenyrske Stavby, 1975, 23 (09): : 460 - 468
  • [47] A New Deal: The Creation of the TVA and the Construction of Norris Dam
    Jones J.
    Civil Engineering Magazine Archive, 2011, 81 (10): : 50 - 52
  • [48] A NEW DEAL: The Creation of the TVA and the Construction of Norris Dam
    Jones, Jenny
    CIVIL ENGINEERING, 2011, 81 (10): : 50 - 52
  • [49] A NEW EXTENSION OF THE 'LEARNT-PROFILE' METHOD.
    Galdecki, Ewa
    ACTA CRYSTALLOGRAPHICA A-FOUNDATION AND ADVANCES, 1996, 52 : C44 - C44
  • [50] SEWER REHAB USING A NEW SUBAREA METHOD.
    Fernandez, R.B.
    Water Engineering and Management, 1986, 133 (02): : 28 - 30