Development of a generative CAPP system for axisymmetric components for a job shop environment

被引:0
|
作者
机构
[1] Kumar, Manish
[2] Rajotia, Sunil
来源
Kumar, M. (mkumargupta@rediffmail.com) | 1600年 / Springer-Verlag London Ltd卷 / 27期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1 / 2
相关论文
共 50 条
  • [11] A Generative CAPP System for Tube Hydro Forming
    Department of Mechanical Engineering, Institute of Technology, Banaras Hindu University, Varanasi
    221005, India
    Kumar, Santosh (santoshk_itbhuv@yahoo.co.in), 1600, Springer (93): : 1 - 25
  • [12] THE CAPP SYSTEM IN CIMS ENVIRONMENT
    Fan Qijin
    Huang Naikang
    Zhang Zhenming(Faculty 1003
    Chinese Journal of Aeronautics , 1995, (02) : 125 - 132
  • [13] Implementing manufacturing execution system in job shop environment with workflow management technology
    Li, HX
    Xue, JS
    Zhu, YL
    ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 120 - 124
  • [14] An implementation of lean scheduling in a job shop environment
    Haider, A.
    Mirza, J.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2015, 10 (01): : 5 - 17
  • [15] Optimal allocation of resources in a job shop environment
    Seshadri, Sridhar
    Pinedo, Michael
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (03): : 195 - 206
  • [16] INTEGRATED PRODUCTION SCHEDULING IN A JOB SHOP ENVIRONMENT
    GRAZIANO, VJ
    MANAGEMENT CONTROLS, 1969, 16 (12): : 270 - 274
  • [17] SCHEDULING IN A BATCH OR JOB SHOP PRODUCTION ENVIRONMENT
    BROWNE, J
    OKELLY, MEJ
    DAVIES, BJ
    ENGINEERING MANAGEMENT INTERNATIONAL, 1982, 1 (03): : 173 - 184
  • [18] Cost based scheduling in a job shop environment
    Kumar, Manish
    Rajotia, Sunil
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (11-12): : 1144 - 1153
  • [19] A STUDY OF PRODUCTION SMOOTHING IN A JOB SHOP ENVIRONMENT
    CRUICKSHANKS, AB
    DRESCHER, RD
    GRAVES, SC
    MANAGEMENT SCIENCE, 1984, 30 (03) : 368 - 380
  • [20] Optimal allocation of resources in a job shop environment
    Seshadri, S
    Pinedo, M
    IIE TRANSACTIONS, 1999, 31 (03) : 195 - 206