Integrated setup planning and fixture design system for prismatic parts

被引:0
|
作者
Natl Univ of Singapore, Singapore, Singapore [1 ]
机构
来源
Int J Comput Appl Technol | / 3-4卷 / 198-212期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] AN INTEGRATED SYSTEM FOR PROCESS-FIXTURE LAYOUT DESIGN OPTIMISATION FOR CUBICAL PARTS
    Khan, A. A.
    Moeenuddin, G.
    Kazim, A. H.
    Kamran, M. S.
    Asim, M.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2019, 30 (02) : 83 - 99
  • [22] Feature Recognition and Datum Extraction for Setup Planning and Operation Sequencing for Prismatic Parts
    Reddy, T. Srikanth
    Shunmugam, M. S.
    INTERNATIONAL JOURNAL OF MANUFACTURING MATERIALS AND MECHANICAL ENGINEERING, 2011, 1 (02) : 19 - 45
  • [23] An integrated fixture planning system for minimum tolerances
    Bansal, S.
    Nagarajan, S.
    Reddy, N. Venkata
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (5-6): : 501 - 513
  • [24] An integrated fixture planning system for minimum tolerances
    S. Bansal
    S. Nagarajan
    N. Venkata Reddy
    The International Journal of Advanced Manufacturing Technology, 2008, 38 : 501 - 513
  • [25] AN INTERACTIVE PROCESS PLANNING SYSTEM FOR PRISMATIC PARTS (ICAPP)
    ESKICIOGLU, H
    DAVIES, BJ
    INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 1981, 21 (3-4): : 193 - 206
  • [26] Study on integrated fixture design system
    Chen, Guang-Feng
    Sun, Yi-Ze
    Liu, Wen-Jian
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 2362 - +
  • [27] AN INTEGRATED RBR FIXTURE DESIGN SYSTEM
    Mihaylov, Oleg
    Nikolcheva, Galina
    CBU INTERNATIONAL CONFERENCE PROCEEDINGS 2017: INNOVATIONS IN SCIENCE AND EDUCATION, 2017, 5 : 1175 - 1180
  • [28] Setup and fixture planning in automated process planning systems
    Joneja, Ajay
    Chang, Tien-Chien
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (07): : 653 - 665
  • [29] Setup and fixture planning in automated process planning systems
    Joneja, A
    Chang, TC
    IIE TRANSACTIONS, 1999, 31 (07) : 653 - 665
  • [30] Stability ofWorkpkce Setup in Feature-Based Fixture Planning System
    Shen Xiaohong Liu XuanCollege of Mechanical Engineering and Automation
    CADDM, 2002, (02) : 37 - 43