共 50 条
- [31] Improving the accuracy of approximate estimates of building projects BUILDING RESEARCH AND INFORMATION, 2001, 29 (04): : 312 - 318
- [36] Improving the Accuracy of Project Cost with BIM 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 266 - 270
- [37] SPLITTING OF HOLOMORPHIC COCYCLES WITH ESTIMATES. SEVERAL VARIABLES GEOMETRIC ANALYSIS OF SEVERAL COMPLEX VARIABLES AND RELATED TOPICS, 2011, 550 : 109 - 138
- [38] Theoretical organically bound tritium dose estimates. HEALTH PHYSICS, 2002, 82 (06): : S150 - S150
- [39] EFFICIENCY OF ENERGY CONVERSION: RATIONAL PRELIMINARY ESTIMATES. Industrial & Engineering Chemistry, Process Design and Development, 1985, 24 (03): : 714 - 718