共 50 条
- [26] THE TIME OF PRODUCT STAYING IN FLOWING VIBROBOILING LAYERS IZVESTIYA VYSSHIKH UCHEBNYKH ZAVEDENII PISHCHEVAYA TEKHNOLOGIYA, 1984, (06): : 79 - 82
- [27] Mapping Product Line Requirements to a Product Line Architecture 18TH INTERNATIONAL SOFTWARE PRODUCT LINE CONFERENCE (SPLC 2014), VOL 1, 2014, : 362 - 362
- [28] WELDABILITY OF LOW-ALLOY STEELS FOR LINE PIPE FITTINGS WELDING JOURNAL, 1974, 53 (08) : S361 - S367