Tree damage to electric utility infrastructure assessing and managing the risk from storms

被引:0
|
作者
Simpson, Peter O. [1 ]
机构
[1] Eastern Utilities, West Bridgewater, United States
关键词
Electric power distribution - Electric utilities - Failure analysis - Management - Meteorological problems - Outages - Plants (botany) - Risk assessment;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:768 / 778
相关论文
共 38 条
  • [31] Assessing and Managing the Current and Future Pest Risk from Water Hyacinth, (Eichhornia crassipes), an Invasive Aquatic Plant Threatening the Environment and Water Security
    Kriticos, Darren J.
    Brunel, Sarah
    PLOS ONE, 2016, 11 (08):
  • [32] Utility of Preoperative Laboratory Testing in Assessing Risk of Adverse Outcomes After Anterior Cervical Discectomy and Fusion: Insights from National Surgical Registry
    Zreik, Jad
    Goyal, Anshit
    Alvi, Mohammed Ali
    Freedman, Brett A.
    Bydon, Mohamad
    WORLD NEUROSURGERY, 2020, 136 : E398 - E406
  • [33] Assessing risk to human health for heavy metal contamination from public point utility through ground dust: a case study in Nantong, China
    Yanping Wang
    Peng Qian
    Dongming Li
    Haifeng Chen
    Xiangqian Zhou
    Environmental Science and Pollution Research, 2021, 28 : 67234 - 67247
  • [34] Assessing risk to human health for heavy metal contamination from public point utility through ground dust: a case study in Nantong, China
    Wang, Yanping
    Qian, Peng
    Li, Dongming
    Chen, Haifeng
    Zhou, Xiangqian
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (47) : 67234 - 67247
  • [35] Application of methods of mathematical landscape morphology to assessing the risk of damage to linear engineering structures resulting from hazardous exogenous geological processes
    Viktorov, A. S.
    Kapralova, V. N.
    WATER RESOURCES, 2012, 39 (07) : 790 - 797
  • [36] Application of methods of mathematical landscape morphology to assessing the risk of damage to linear engineering structures resulting from hazardous exogenous geological processes
    A. S. Viktorov
    V. N. Kapralova
    Water Resources, 2012, 39 : 790 - 797
  • [37] Assessing Flood Risk over Time Using Expected Annual Damage Information from the 2017 Central Valley Flood Protection Plan Update
    Dhillon, Devinder
    Pingel, Nathan
    Lee, Donna
    Horvath, Mary
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: WATERSHED MANAGEMENT, IRRIGATION AND DRAINAGE, AND WATER RESOURCES PLANNING AND MANAGEMENT, 2017, : 654 - 668
  • [38] Utility of healthcare professional (HCP) surveys for evaluating the effectiveness of additional risk minimization measures (aRMMs): Experience from an HCP survey assessing the effectiveness of aRMMs for Xeljanz® in Europe
    Wu, Joanne
    Lem, Joanna
    Koram, Nana
    Asomaning, Kofi
    Merchant, Lubna
    Massouh, Robert
    Nagy, Edward
    Vranic, Ivana
    Khalid, Subhan
    Walsh, Laura K.
    Bosan, Rafia
    Cantos, Krystal
    PHARMACOEPIDEMIOLOGY AND DRUG SAFETY, 2023, 32 : 301 - 301