SAFETY STUDIES RELATED TO RRR PROJECTS.

被引:0
|
作者
Brinkman, Charles P.
机构
来源
Transportation engineering journal of ASCE | 1982年 / 108卷 / TE4期
关键词
ROADS AND STREETS - Skid Resistance - TRAFFIC SURVEYS;
D O I
暂无
中图分类号
学科分类号
摘要
The Resurfacing, Restoration and Rehabilitation (RRR) Program and, in general, the improvements often associated with RRR projects on safety are discussed. Studies that analyze traffic accident data are presented. The safety implications of resurfacing, skid resistance, lane and shoulder width delineation, and the removal of roadside and fixed objects are discussed.
引用
收藏
页码:307 / 312
相关论文
共 50 条
  • [41] MINE VENTILATION AND COOLING PROJECTS.
    van der Valt, J.
    de Kock, E.M.
    Engineering and Mining Journal, 1983, 184 (08): : 63 - 68
  • [42] MICROCOMPUTERS HELP PLAN PROJECTS.
    Abbott, Kenneth W.
    World construction English ed., 1984, 37 (02): : 56 - 61
  • [43] TALE OF FOUR MILLWIDE PROJECTS.
    Kallos, S.E.
    Nieminen, P.
    PIMA, 1987, 69 (07): : 29 - 33
  • [44] The life of the law: Anthropological projects.
    Lazarus-Black, M
    AMERICAN ANTHROPOLOGIST, 2004, 106 (03) : 628 - 629
  • [45] Mentoring undergraduate research projects.
    Hatfull, GF
    DEVELOPMENTAL BIOLOGY, 2005, 283 (02) : 587 - 587
  • [46] REDUCING SPILL AT HYDRO PROJECTS.
    Crawford, N.H.
    International Water Power and Dam Construction, 1984, 36 (11): : 51 - 53
  • [47] ON COMMERCIAL EXPERT SYSTEMS PROJECTS.
    Marchand, H.
    Future Generation Computer Systems, 1986, 2 (04) : 213 - 216
  • [48] IMPACT ASSESSMENT OF DEVELOPMENT PROJECTS.
    Chaturvedi, Shobha
    Pandey, G.N.
    Swarup, Hemlata
    Chemical Age of India, 1983, 34 (05): : 281 - 285
  • [49] CONCURRENT DELAYS IN CONSTRUCTION PROJECTS.
    Kraiem, Zaki M.
    Diekmann, James E.
    Journal of Construction Engineering and Management, 1987, 113 (04) : 591 - 602
  • [50] DEVELOPING JONT WATER PROJECTS.
    Hardten, Ronald D.
    Journal / American Water Works Association, 1984, 76 (04): : 131 - 133