Method of project scheduling under fuzziness in estimation of durations, precedence relationships and interruptions of activities

被引:0
|
作者
Chishaki, T.
Tseng, H.
Tatish, M.
Tatsumi, H.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 28 条
  • [1] Method of Project Scheduling under Fuzzy Estimation of Durations and Precedence Relationships of Activities
    Tseng, H. S.
    Chiou, H. W.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1914 - 1922
  • [2] HEURISTIC SCHEDULING OF ACTIVITIES UNDER RESOURCE AND PRECEDENCE RESTRICTIONS
    THESEN, A
    MANAGEMENT SCIENCE, 1976, 23 (04) : 412 - 422
  • [3] Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    OR SPECTRUM, 2016, 38 (02) : 405 - 425
  • [4] Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
    Lucio Bianco
    Massimiliano Caramia
    Stefano Giordani
    OR Spectrum, 2016, 38 : 405 - 425
  • [6] Project scheduling with generalized precedence relations: A new method to analyze criticalities and flexibilities
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 298 (02) : 451 - 462
  • [7] Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    Salvatore, Alessio
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 193 - 224
  • [8] Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
    Quintanilla, Sacramento
    Perez, Angeles
    Lino, Pilar
    Valls, Vicente
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 219 (01) : 59 - 72
  • [9] Reactive project scheduling method to enhance project progress under uncertainty
    Suwa, Haruhiko
    Morita, Daisuke
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (03):
  • [10] A HEURISTIC METHOD FOR THE ESTIMATION OF THE PROJECT DURATION IN A STOCHASTIC NETWORK SCHEDULING
    GARAVELLI, AC
    PONTRANDOLFO, P
    RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1995, 29 (03): : 285 - 298