ESTIMATION OF THE PRODUCTION RATE FOR A TWO-STAGE MANUAL FLOW LINE.

被引:0
|
作者
Iyama, Toshirou
机构
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
TIME AND MOTION STUDY
引用
收藏
页码:1 / 7
相关论文
共 50 条
  • [41] POLCA Control in Two-Stage Production Systems
    Fernandes, Nuno O.
    Thurer, Matthias
    Mirzaei, Nima
    Ferreira, Luis Pinto
    Silva, Francisco J. G.
    Carmo-Silva, Silvio
    30TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2021), 2020, 51 : 1491 - 1496
  • [42] Efficiency Bounds for Two-Stage Production Systems
    Shi, Xiao
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [43] Scheduling production tasks in a two-stage FMS
    Blazewicz, J
    Pawlak, G
    Walter, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4341 - 4352
  • [44] Development of A Compact Two-Stage Transmission Line Transformer
    Jiang, Chunyang
    Xia, Shengguo
    PROGRESS IN RENEWABLE AND SUSTAINABLE ENERGY, PTS 1 AND 2, 2013, 608-609 : 1276 - +
  • [45] Two-stage Photograph Cartoonization via Line Tracing
    Li, Simin
    Wen, Qiang
    Zhao, Shuang
    Sun, Zixun
    He, Shengfeng
    COMPUTER GRAPHICS FORUM, 2020, 39 (07) : 587 - 599
  • [46] Two-stage turbocharger modeling for engine control and estimation
    Shu, Yong
    van Nieuwstadt, Michiel
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION 2007, VOL 16: TRANSPORTATION SYSTEMS, 2008, : 243 - 252
  • [47] Two-stage rank estimation of quantile index models
    Khan, S
    JOURNAL OF ECONOMETRICS, 2001, 100 (02) : 319 - 355
  • [48] Robust two-stage estimation in hierarchical nonlinear models
    Yeap, BY
    Davidian, M
    BIOMETRICS, 2001, 57 (01) : 266 - 272
  • [49] Robust two-stage approach for image motion estimation
    Tang, CY
    Hung, YP
    Chen, Z
    ELECTRONICS LETTERS, 1998, 34 (11) : 1091 - 1093
  • [50] Two-stage benchmarking as applied to small area estimation
    Ghosh, Malay
    Steorts, Rebecca C.
    TEST, 2013, 22 (04) : 670 - 687