共 50 条
- [21] IMPROVE RELIABILITY OF ADVANCED TOWER CONTROL. Hydrocarbon Processing, 1980, 59 (10): : 117 - 120
- [24] PRACTICAL IMPLEMENTATION OF ADVANCED PROCESS CONTROL. Certificated engineer, 1982, 55 (08): : 4 - 9
- [30] New High-Pressure Gas Burner System Adapted for Computer Control. Gaswaerme International, 1986, 35 (06): : 341 - 346