共 50 条
- [41] FEASIBILITY OF GREENHOUSE HEATING IN PENNSYLVANIA WITH POWER-PLANT WASTE HEAT TRANSACTIONS OF THE ASAE, 1979, 22 (06): : 1375 - 1380
- [42] DENSIFIED BIOMASS AS AN ALTERNATIVE ARMY HEATING AND POWER PLANT FUEL. Technical Report - United States Army Corps of Engineers, Construction Engineering Research Laboratory, 1980,
- [44] Solar feed water heating feasibility for a conventional steam power plant Journal of Mechanical Science and Technology, 2017, 31 : 3573 - 3580
- [46] Technology and mode of the virtual thermal power plant in the clean heating field FOURTH INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2020, 467
- [47] Optimal operation of a District Heating power plant with Thermal Energy Storage 2016 AMERICAN CONTROL CONFERENCE (ACC), 2016, : 2334 - 2339
- [48] NONAZEOTROPIC BINARY-MIXTURES FOR POWER-PLANT AND HEATING EXIGENCIES BRENNSTOFF-WARME-KRAFT, 1987, 39 (06): : 300 - 300
- [49] Biomass heating power plant Ulm - operating experience and optimisation potential STROM UND WARME AUS BIOGENEN FESTBRENNSTOFFEN, 2008, 2044 : 101 - 105
- [50] Incorporating a district heating/cooling system into an existing geothermal power plant JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1998, 120 (02): : 179 - 184