共 50 条
- [42] A practical algorithm for final-pit optimization in open-pit coal mines Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (05): : 715 - 718
- [43] Simultaneous Optimization of Final Pit and Production Schedule in Open-pit Coal Mines INNOVATION MANUFACTURING AND ENGINEERING MANAGEMENT, 2011, 323 : 222 - +
- [45] Landform reshaping optimization of inner dump based on hydrological fusion in grassland open-pit coal mine Meitan Xuebao/Journal of the China Coal Society, 2023, 48 (04): : 1673 - 1686
- [46] Mid-long term boundary dynamic optimization of open-pit coal mine considering coal price fluctuation PLOS ONE, 2024, 19 (02):
- [47] Boundary optimization of inclined coal seam open-pit mine based on the ISSA–LSSVR coal price prediction method Scientific Reports, 13
- [48] Optimization of open-pit mine depressurization system I using simulated annealing technique JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2007, 133 (07): : 825 - 830
- [49] Optimization of underground mining development direction about end slope coal pillar recovery of open-pit coal mine Ding, X.-P. (ccridxp@163.com), 1923, China Coal Society (38):