Construction of the KNK II Facility.

被引:0
|
作者
Marth, W.
Mausbeck, H.
Andrae, H.
Brudermuelller, G.
机构
来源
| 1978年 / 23卷 / 03期
关键词
D O I
暂无
中图分类号
TL [原子能技术];
学科分类号
0827 ;
摘要
After almost two and a half years of conversion work the 20 MWe KNK II Experimental Nuclear Power Station was started up again on October 10, 1977 at the Karlsruhe Nuclear Research Center. KNK II is the most important facility in German fast breeder reactor development. It represents the first fast sodium cooled reactor available in the Federal Republic as a test bed for practical tests of fast breeder fuel and for tests under reactor conditions of specific breeder reactor components. The Compact Sodium Cooled Nuclear Reactor built by INTERATOM had been operated with a thermal core as KNK I between 1971 and mid-1974, mainly serving to prove that the technology of sodium cooling was managed even on a large technical scale.
引用
收藏
页码:118 / 122
相关论文
共 50 条
  • [41] ELECTROCHEMICAL MACHINING DEMONSTRATION FACILITY.
    Ayres, F.N.
    Matthews, R.D.
    The International journal of applied engineering education, 1987, 3 (01): : 59 - 67
  • [42] CONSTRUCTION AND OPERATION OF THE 12-T SUPERCONDUCTING COILS FOR THE MIRROR FUSION TEST FACILITY.
    Zbasnik, J.P.
    Kozman, T.A.
    Shimer, D.W.
    Hathaway, D.R.
    IEEE Transactions on Magnetics, 1986, MAG-23 (02)
  • [43] Radiochemical diagnostics for the national ignition facility.
    Stoyer, MA
    Hudson, GB
    Lougheed, RW
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1996, 212 : 10 - NUCL
  • [44] Holifield Radioactive Ion Beam Facility.
    Bertrand, FE
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2001, 221 : U74 - U74
  • [45] DESIGN OF A MODERN PLASTIC PAINTING FACILITY.
    Bhushan, Dinesh
    Products Finishing (Cincinnati), 1988, 52 (05): : 68 - 75
  • [46] EXPERIMENTAL SPEECH STORAGE AND EDITING FACILITY.
    Maxemchuk, Nicholas F.
    1600, (59):
  • [47] ROCKLAND, MASSACHUSETTS WASTEWATER TREATMENT FACILITY.
    Laro, Ronald A.
    Ross, George E.
    Journal of the New England Water Pollution Control Association, 1985, 19 (02): : 94 - 102
  • [48] HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY.
    Sharpiro, Gerald W.
    Nuttle, Henry L.
    IIE Transactions (Institute of Industrial Engineers), 1988, 20 (02): : 157 - 167
  • [49] CONTROLLING METRICATION COSTS IN A PRODUCTION FACILITY.
    Medvedeff, Andre' S.
    SME Technical Paper (Series) IQ, 1976,
  • [50] MULTIPLE USE OF AN UPGRADED FMIT FACILITY.
    Burke, R.J.
    Johnson, D.L.
    Carter, L.L.
    IEEE Transactions on Nuclear Science, 1985, NS-32 (05)