Hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies

被引:0
|
作者
SUNY at Buffalo, Buffalo, United States [1 ]
机构
来源
Comput Ind Eng | / 4卷 / 1047-1060期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] A multi-agent system for dynamic just-in-time manufacturing production scheduling
    Boccalatte, A
    Gozzi, A
    Paolucci, M
    Queirolo, V
    Tamoglia, M
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 5548 - 5553
  • [32] A multi-criteria cross-docking scheduling with just-in-time approach
    A. R. Boloori Arabani
    S. M. T. Fatemi Ghomi
    M. Zandieh
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 741 - 756
  • [33] Multi-scenario scheduling to maximise the weighted number of just-in-time jobs
    Gilenson, Miri
    Shabtay, Dvir
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2019, 72 (08) : 1762 - 1779
  • [34] Multi-agent Just-in-time Manufacturing Scheduling System for Dynamic Environment
    Jiang, Yingzhe
    Weng, Wei
    Fujimura, Shigeru
    PROCEEDINGS 2016 5TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS IIAI-AAI 2016, 2016, : 1022 - 1025
  • [35] A multi-criteria cross-docking scheduling with just-in-time approach
    Arabani, A. R. Boloori
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 741 - 756
  • [36] Multi-Objective Genetic Algorithm in Green Just-in-time Logistics
    Memari, Ashkan
    Rahim, Abd Rahman Abdul
    Ahmad, Robiah
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 1239 - 1243
  • [37] A novel multi-level hybrid load balancing and tasks scheduling algorithm for cloud computing environment
    Elsakaan, Nadim
    Amroun, Kamal
    JOURNAL OF SUPERCOMPUTING, 2024, 80 (09): : 13434 - 13474
  • [38] Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines
    Mumtaz, Jabir
    Guan, Zailin
    Yue, Lei
    Zhang, Li
    He, Cong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (20) : 6252 - 6267
  • [39] A heuristic algorithm for one-machine just-in-time scheduling problem with periodic time slots
    Chiba, E
    Hiraishi, K
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 2005, E88A (05) : 1192 - 1199
  • [40] Development of a genetic algorithm for scheduling products with a multi-level structure
    Chen, K.J.
    Ji, P.
    International Journal of Advanced Manufacturing Technology, 2007, 33 (11-12): : 1229 - 1236