Train Security and Automation System of the Amsterdam Metro after Five Years of Operation.

被引:0
|
作者
Meijer, Jan [1 ]
Drews, Dietrich [1 ]
机构
[1] Metro Amsterdam, Neth, Metro Amsterdam, Neth
来源
eb - Elektrische Bahnen | 1985年 / 83卷 / 11期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:376 / 384
相关论文
共 50 条
  • [41] Reorganization of the western Himalayan river system after five million years ago
    Clift, PD
    Blusztajn, J
    NATURE, 2005, 438 (7070) : 1001 - 1003
  • [42] Performance of the NUTTelA-TAO Instrument System After Two Years of Operation
    Grossan, B.
    Maksut, Z.
    Komesh, T.
    Krugov, M.
    GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY IX, 2022, 12184
  • [43] Analysis of load carrying capacity of bridges strengthened by extracorporeal prestressing after five years of operation: a case study
    Wan, Lijun
    Qiao, Jiaqi
    Sun, Quansheng
    INTERNATIONAL JOURNAL OF STRUCTURAL INTEGRITY, 2024, 15 (05) : 931 - 947
  • [44] The performance of the knowledge-based system VALAB revisited: An evaluation after five years
    Valdiguie, PM
    Rogari, E
    Corberand, JX
    Boneu, B
    EUROPEAN JOURNAL OF CLINICAL CHEMISTRY AND CLINICAL BIOCHEMISTRY, 1996, 34 (04): : 371 - 376
  • [45] Self-improving System Integration - Status and Challenges After Five Years of SISSY
    Bellman, Kirstie
    Botev, Jean
    Diaconescu, Ada
    Esterle, Lukas
    Gruhl, Christian
    Landauer, Chris
    Lewis, Peter R.
    Stein, Anthony
    Tomforde, Sven
    Wuertz, Rolf P.
    2018 IEEE 3RD INTERNATIONAL WORKSHOPS ON FOUNDATIONS AND APPLICATIONS OF SELF* SYSTEMS (FAS*W), 2018, : 160 - 167
  • [46] A case of purulent pericarditis associated with empyema in a child aged two and a-half years. Death nearly four months after a double operation.
    Coutts, JA
    Rowlands, RP
    BMJ-BRITISH MEDICAL JOURNAL, 1904, 1904 : 9 - 13
  • [47] EVALUATION OF SMAC SYSTEM AFTER 1-1/2-YEARS-OF-OPERATION
    RUSH, RL
    NABB, DP
    CLINICAL CHEMISTRY, 1976, 22 (07) : 1171 - 1171
  • [48] POWER-SUPPLY SYSTEM WITH BOOSTER CONVERTERS - VIEWPOINTS AFTER 10 YEARS IN OPERATION
    WOLPERT, T
    BJORK, D
    ERICSSON REVIEW, 1975, 52 (01): : 14 - 23
  • [49] Performance of a passive treatment system for net-acidic coal mine drainage over five years of operation
    Matthies, Romy
    Aplin, Andrew C.
    Jarvis, Adam P.
    SCIENCE OF THE TOTAL ENVIRONMENT, 2010, 408 (20) : 4877 - 4885
  • [50] Applying Hybrid Decision-Making Method Based on Fuzzy AHP-WOWA Operator for Emergency Alternative Evaluation of Unattended Train Operation Metro System
    Zhao, Bobo
    Tang, Tao
    Ning, Bin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016