共 50 条
- [23] Job scheduling and due date decision with limited processing time distribution with quadratic penalty function PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON SYSTEM MANAGEMENT, 2008, : 283 - 288
- [25] Multi-Objective Scheduling Problems Subjected to Special Process Constraint 2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 105 - +
- [27] Semiconductor business, process, product and fab influence on throughput, cycle time and chip cost. 1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 119 - 139
- [30] Infinite Time-Dependent Network Equilibria with a Multivalued Cost Function Journal of Optimization Theory and Applications, 2006, 131 : 405 - 415