共 50 条
- [21] SYSTEM CHARACTERISTIC AND COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH SPARE UNITS MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 691 - 698
- [22] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM UNDER THE INFLUENCE OF EARTHQUAKES MICROELECTRONICS AND RELIABILITY, 1994, 34 (04): : 735 - 739
- [23] COST-BENEFIT-ANALYSIS OF A 2-UNIT DETERIORATING STANDBY SYSTEM WITH DETECTOR MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 863 - 866
- [24] PROFIT ANALYSIS OF 2-UNIT STANDBY SYSTEM WITH REST PERIOD FOR THE OPERATOR AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 753 - 757
- [26] COST-ANALYSIS FOR 2-UNIT WARM STANDBY SYSTEMS MICROELECTRONICS AND RELIABILITY, 1992, 32 (08): : 1079 - 1081
- [27] COMPOUND AVAILABILITY MEASURES FOR A 2-UNIT STANDBY SYSTEM MICROELECTRONICS AND RELIABILITY, 1990, 30 (03): : 425 - 429
- [28] SWITCH FAILURE IN A 2-UNIT STANDBY REDUNDANT SYSTEM MICROELECTRONICS AND RELIABILITY, 1983, 23 (01): : 129 - 132
- [30] COST-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH 2 TYPES OF OPERATION AND REPAIR MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 71 - 75