共 50 条
- [41] Generation Control Scheduling Model of Three Gorges Power Station during Non-abandon water period FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 2031 - 2034
- [42] Results of a Model Study of Modernized Generating Units for a Low-head Hydro-power Station. Trudy LPI, 1981, (375): : 60 - 65
- [43] ROLE OF DESIGN COMPLEXITY IN FORECASTING RELIABILITY AND AVAILABILITY FOR ELECTRIC POWER GENERATING UNITS. Electric Power Research Institute, Advanced Power Systems Division, (Report) EPRI AP, 1982,
- [44] RANKINE - A COMPUTER SOFTWARE PACKAGE FOR THE ANALYSIS AND DESIGN OF STEAM POWER GENERATING-UNITS JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1987, 109 (02): : 222 - 227
- [46] In-core reload design for cycle 4 of the units of Daya Bay Nuclear Power Station Hedongli Gongcheng/Nuclear Power Engineering, 1998, 19 (04): : 385 - 389
- [49] Study on the Influence of Structural Parameters of Semiconductor Thermoelectric Units on Power Generation Characteristics 2019 IEEE 4TH INTERNATIONAL FUTURE ENERGY ELECTRONICS CONFERENCE (IFEEC), 2019,
- [50] The main protection scheme of internal short circuit for generator of large-sized (above 600 MW) hydroelectric power station - Based on simulation for generators of Three Gorges hydroelectric power station Dianli Xitong Zidonghue/Automation of Electric Power Systems, 1999, 23 (11):