共 50 条
- [42] GRAVITY DRAINAGE OF STEAM-HEATED HEAVY OIL TO PARALLEL HORIZONTAL WELLS. Technical Papers - NCTA Annual Convention (National Cable Television Association), 1980,
- [43] Multilateral Wells: Maximizing Well Productivity PUMPS AND PIPES: PROCEEDINGS OF THE ANNUAL CONFERENCE, 2011, : 71 - 86
- [45] PRODUCTIVITY OF MULTIPLE DRAINHOLES OR FRACTURED HORIZONTAL WELLS SPE FORMATION EVALUATION, 1993, 8 (01): : 11 - 16
- [46] A supplemental discussion of productivity formulae of horizontal wells JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2003, 42 (10): : 23 - 27
- [47] The Effect of Interlayers on the Productivity of Fractured Horizontal Wells ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (17): : 5825 - 5836