共 50 条
- [31] Selection and influence of turbine installation elevation for underground power station Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2000, (01): : 86 - 91
- [33] The ISO 9001 combined cycle gas turbine power station INTERNATIONAL CONFERENCE ON POWER STATION MAINTENANCE 2000, 2000, 2000 (07): : 53 - 61
- [34] LOY YANG A POWER STATION - TURBINE HOUSE DESIGN. Institution of Engineers, Australia, Civil Engineering Transactions, 1982, 24 (04): : 297 - 305
- [35] Process control system of gas-turbine power station Pribory i Sistemy Upravleniya, 2002, (10): : 16 - 19
- [37] Considerations on the Operation & Management of a Modern Wind Turbine Power Station 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 680 - 686
- [38] The power station of the corperative turbine production plant in Berlin. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1909, 53 : 648 - 655
- [40] AUTOMATED CONTROL OF A REMOTE GAS TURBINE POWER STATION. Aust J Instrum Control Ser 2, 1988, 1 (16-20):