OPTIMUM-AIV. A planning and scheduling system for spacecraft AIV

被引:0
|
作者
Arentoft, M.M. [1 ]
Fuchs, J.J. [1 ]
Parrod, Y. [1 ]
Gasquet, A. [1 ]
Stader, J. [1 ]
Stokes, I. [1 ]
Vadon, H. [1 ]
机构
[1] Computer Resources Int, Birkerod, Denmark
关键词
Expert Systems - Knowledge Bases - Scheduling - Computer Applications - Spacecraft - Repair;
D O I
10.1016/0167-739X(92)90055-G
中图分类号
学科分类号
摘要
This paper presents a project undertaken for the European Space Agency (FSA). The project is developing a knowledge based system for planning and scheduling of activities for spacecraft assembly, integration and verification (AIV). The system extends to the monitoring of plan execution and the plan repair phases. The objectives of the contract are to develop an operational kernel of a planning, scheduling and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in the initial specification of the AIV plan, in the verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of May 1991, is that the architectural design of the system has been agreed on by ESTEC/FSA and detailed design and implementation is now underway, expecting a final delivery in October of 1991.
引用
收藏
页码:403 / 412
相关论文
共 50 条
  • [31] Challenges in Designing an Automated System for Planning Spacecraft Activities
    Policella, Nicola
    Oliveira, Henrique
    Benzi, Edoardo
    2014 IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY (SMC-IT), 2014, : 1 - 8
  • [32] Integrated Production Planning and Scheduling System Design
    Li Liqing
    Lu Hai
    Li Gongliang
    Yang Guanghong
    PROCEEDINGS OF 2017 8TH IEEE INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND SERVICE SCIENCE (ICSESS 2017), 2017, : 731 - 734
  • [33] A SOFTWARE SYSTEM FOR OPTIMUM DESIGN AND TRAJECTORY PLANNING OF ROBOTS
    DING, H
    CHEN, JX
    XIONG, YL
    LU, YH
    FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING, 1988, : 245 - 250
  • [34] Realization of multi-agent planning system for autonomous spacecraft
    Xu, R
    Cui, PY
    Xu, XF
    ADVANCES IN ENGINEERING SOFTWARE, 2005, 36 (04) : 266 - 272
  • [35] A hierarchical system for automated path planning and scheduling
    Korzeniowski, KA
    McVey, CB
    MOBILE ROBOTS XIII AND INTELLIGENT TRANSPORTATION SYSTEMS, 1998, 3525 : 204 - 211
  • [36] Planning and Scheduling for Dispersed and Collaborative Productive System
    Pessoa, Marcosiris A. O.
    Junqueira, Fabricio
    Miyagi, Paulo E.
    Santos Fo, Diolino J.
    TECHNOLOGICAL INNOVATION FOR SUSTAINABILITY, 2011, 349 : 57 - 64
  • [37] MAINTENANCE SCHEDULING FOR GENERATION SYSTEM PLANNING.
    Stremel, John P.
    Radiophysics and Quantum Electronics (English Translation of Izvestiya Vysshikh Uchebnykh Zavedenii, Radiofizika), 1980,
  • [38] MAINTENANCE SCHEDULING FOR GENERATION SYSTEM-PLANNING
    STREMEL, JP
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (03): : 1410 - 1419
  • [39] Planning and scheduling maintenance resources in a complex system
    Newby, Martin
    Barker, Colin
    SAFETY, RELIABILITY AND RISK ANALYSIS: THEORY, METHODS AND APPLICATIONS, VOLS 1-4, 2009, : 619 - 625
  • [40] Iterative repair planning for spacecraft operations using the ASPEN system
    Rabideau, G
    Knight, R
    Chien, S
    Fukunaga, A
    Govindjee, A
    ISAIRAS '99: FIFTH INTERNATIONAL SYMPOSIUM ON ARTIFICIAL INTELLIGENCE, ROBOTICS AND AUTOMATION IN SPACE, 1999, 440 : 99 - 106