Innovative cable-stayed bridge

被引:0
|
作者
Christoffersen, Jens
Jensen, Henrik Elgaard
Hauge, Lars
Bjerrum, John
机构
来源
Concrete (London) | 1998年 / 32卷 / 07期
关键词
Footbridges - Structural design - Carbon fiber reinforced plastics - Composite bridges - Reinforced concrete - Corrosion;
D O I
暂无
中图分类号
学科分类号
摘要
The construction of an innovative cable-stayed footbridge across Herning in Denmark is scheduled to begin in August 1998. The footbridge, which will make extensive use of carbon fiber reinforced plastic (CFRP) materials, is composed of two equal spans of 40 m and a girder width of 5.4 m. The bridge is a key element in an R&D project aimed at evaluating the potential of new non-corrosive materials in bridge structures. The bridge will be structurally monitored after completion to ensure the structural integrity of the structure and to gain information on the behavior of the CFRP products. Reactions on abutments and forces in selected CFRP reinforcement bars will also be measured regularly together with precision measurements of the bridge geometry.
引用
收藏
页码:32 / 34
相关论文
共 50 条
  • [31] Dynamic tests of the Santarem cable-stayed bridge
    Rodrigues, J
    PROCEEDINGS OF IMAC-XIX: A CONFERENCE ON STRUCTURAL DYNAMICS, VOLS 1 AND 2, 2001, 4359 : 1146 - 1152
  • [32] Second Severn crossing - cable-stayed bridge
    Mizon, DH
    Smith, N
    Yeoward, AJ
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1997, 120 : 49 - 63
  • [33] Replacement of the stays on a major cable-stayed bridge
    Sandberg, J.
    Hendy, C. R.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (01) : 31 - 42
  • [34] Research on Structure design of Cable-stayed Bridge
    Li, Xi
    Cai, Tingting
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2565 - 2569
  • [35] Initial thoughts on the design of a cable-stayed bridge
    Hunt, I
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 1997, 122 (02) : 218 - 226
  • [36] Global analysis of the SuTong cable-stayed bridge
    Miao, Jiawu
    Xiao, Rucheng
    Pei, Minshan
    Zhang, Xigang
    Pircher, Martin
    Janjic, Dorian
    IABSE Conference New Delhi, India 2005: ROLE OF STRUCTURAL ENGINEERS TOWARDS REDUCTION OF POVERTY, 2005, : 343 - 348
  • [37] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI.
    Anon
    Welding Design and Fabrication, 1984, 57 (06): : 67 - 70
  • [38] On the collapse of the Nienburg cable-stayed road bridge
    Birnstiel, C.
    BRIDGE STRUCTURES, 2013, 9 (2-3) : 83 - 100
  • [39] DYNAMIC STABILITY OF CABLE-STAYED BRIDGE PYLONS
    Michaltsos, G. T.
    Raftoyiannis, I. G.
    Konstantakopoulos, T. G.
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2008, 8 (04) : 627 - 643
  • [40] Lateral vibration on a pedestrian cable-stayed bridge
    Nakamura, Shun-Ichi
    Fujino, Yozo
    Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2002, 12 (04): : 295 - 300