共 50 条
- [41] Quality assurance at power plant valves made of cast steel VGB-Kraftwerkstechnik, 1995, 75 (12): : 1056 - 1058
- [43] Analysis on the Reliability Assurance Program of Advanced Nuclear Power Plant Operating PROCEEDINGS OF 2014 10TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY (ICRMS), VOLS I AND II, 2014, : 1008 - 1011
- [45] PROPOSED INDUSTRIAL STANDARD FOR NUCLEAR PLANT QUALITY ASSURANCE PROGRAM REQUIREMENTS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1970, : 3 - &
- [46] DEVELOPMENT AND IMPLEMENTATION OF A QUALITY ASSURANCE SYSTEM FOR AN OPERATIONAL NUCLEAR GENERATING PLANT TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 21 : 2 - 2
- [49] QUALITY ASSURANCE AT GERMAN NUCLEAR-POWER-PLANTS - A REPORT ON THE SPECIAL SESSION QUALITY ASSURANCE AT THE ANNUAL NUCLEAR TECHNOLOGY CONFERENCE 85 IN MUNICH ATOM & STROM, 1985, 31 (06): : 170 - 180
- [50] QUALITY ASSURANCE ACTIVITIES FOR OPERATIONS PHASE OF NUCLEAR-POWER PLANTS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1974, 18 (JUN23): : 298 - 298