GENERATION PLANNING MODEL WITH RELIABILITY CONSTRAINTS.

被引:0
|
作者
Anders, George J.
机构
来源
SAE Preprints | 1981年
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
MATHEMATICAL MODELS - Applications - PROBABILITY - Random Processes
引用
收藏
相关论文
共 50 条
  • [41] Calculation of hole sizes with sum constraints.
    Remenyi, R
    Comba, P
    Okon, N
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2000, 219 : U733 - U733
  • [42] Plates in a Solid Mechanics Formulation with Constraints.
    Marks, Maria
    Rozprawy Inzynierskie, 1980, 28 (01): : 93 - 116
  • [43] Polymer segmental dynamics and entanglement constraints.
    English, AD
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2000, 219 : U475 - U476
  • [44] Linear Optimal Control With Structural Constraints.
    Eitelberg, E.
    Regelungstechnik RT, 1982, 30 (05): : 175 - 180
  • [45] ELASTIC AND ELASTOPLASTIC STRUCTURES WITH UNILATERAL CONSTRAINTS.
    Cais, Stanislav
    Acta Technica CSAV (Ceskoslovensk Akademie Ved), 1978, 23 (04): : 498 - 516
  • [46] DEVELOPMENT OF MINING MACHINERY TRENDS AND CONSTRAINTS.
    Chakraborti, P.K.
    Journal of Mines, Metals and Fuels, 1988, 36 (02): : 68 - 72
  • [47] SCHEDULING PARALLEL COMPUTATIONS WITH STORAGE CONSTRAINTS.
    Tani, Katsuji
    Murata, Tadao
    1978, : 736 - 743
  • [48] RELIABILITY EVALUATION FOR APPLICATION IN GENERATION PLANNING
    IRISARRI, G
    ELABIAD, AH
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (06): : 1916 - 1916
  • [49] Complexity of Scheduling Under Resource Constraints.
    Blazewicz, J.
    Weglarz, J.
    Archiwum Automatyki i Telemechaniki, 1984, 29 (1-2): : 3 - 33
  • [50] SAMPLED-DATA AUTOMATIC GENERATION CONTROL OF INTERCONNECTED REHEAT THERMAL SYSTEMS CONSIDERING GENERATION RATE CONSTRAINTS.
    Kothari, M.L.
    Satsangi, Prem Saran
    Nada, Janardan
    Engineering News-Record, 1981,