共 50 条
- [43] PREEMPTIVE DUE-DATE SCHEDULING WITH MINIMUM MAKESPAN. International Journal on Policy and Information, 1985, 9 (02): : 137 - 140
- [44] IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION EUROPEAN SIMULATION AND MODELLING CONFERENCE 2009, 2009, : 141 - 145
- [49] Optimal common due-date with completion time tolerance Computers and Operations Research, 1996, 23 (12): : 1203 - 1210