TIME SPACE SCHEDULING METHOD.

被引:0
|
作者
Stradal, Oldrich
Cacha, Josef
机构
来源
Journal of the Construction Division | 1982年 / 108卷 / CO3期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
5
引用
收藏
页码:445 / 457
相关论文
共 50 条
  • [31] Constant time NMR signals processed by the filter diagonalization method.
    De Angelis, AA
    Chen, JH
    Mandelshtam, VA
    Shaka, AJ
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2001, 222 : U197 - U197
  • [32] SIMPLIFIED DIRECT TIME INTEGRATION BOUNDARY-ELEMENT METHOD.
    Belytschko, T.
    Chang, H.S.
    Journal of Engineering Mechanics, 1988, 114 (01) : 117 - 134
  • [33] SOME EXPERIENCES WITH THE PKF DISCRETE-TIME IDENTIFICATION METHOD.
    Banyasz, Cs.
    Keviczky, L.
    Problems of Control and Information Theory, 1975, 4 (03): : 259 - 274
  • [34] IMPROVING THE ACCURACY OF TIME INTERVAL MEASUREMENTS BY THE RANDOM COINCIDENCE METHOD.
    Tyrsa, V.E.
    Khokhryakov, M.V.
    Measurement Techniques, 1987, 30 (03) : 263 - 264
  • [35] On the performance of scheduling over space-time architectures
    Gozali, R
    Buehrer, RM
    Woerner, BD
    IEEE 56TH VEHICULAR TECHNOLOGY CONFERENCE, VTC FALL 2002, VOLS 1-4, PROCEEDINGS, 2002, : 415 - 419
  • [36] SCHEDULING IN A CONTINUOUS AREA-TIME DESIGN SPACE
    CORTADELLA, J
    BADIA, RM
    AYGUADE, E
    MICROPROCESSING AND MICROPROGRAMMING, 1991, 32 (1-5): : 199 - 206
  • [37] GVT and scheduling in space time memory based techniques
    Fabbri, Alessandro
    Proceedings of the Workshop on Parallel and Distributed Simulation, PADS, 1999, : 54 - 61
  • [38] GVT and scheduling in space time memory based techniques
    Fabbri, A
    THIRTEENTH WORKSHOP ON PARALLEL AND DISTRIBUTED SIMULATION - PROCEEDINGS, 1999, : 54 - 61
  • [39] A discourse on the method.
    Ariew, Roger
    MODERN LANGUAGE REVIEW, 2007, 102 : 231 - 231
  • [40] The Decroly method.
    不详
    ANNEE PSYCHOLOGIQUE, 1922, 23 : 549 - 551