共 50 条
- [41] HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY. IIE Transactions (Institute of Industrial Engineers), 1988, 20 (02): : 157 - 167
- [45] SAFETY SYSTEM IN LNG RECEIVING FACILITY. Nippon Kokan technical report overseas, 1984, (42): : 114 - 118
- [47] Chemical management at a large research facility. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1997, 213 : 11 - CHAS