首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Ataturk nears completion
被引:0
|
作者
:
Ozis, U.
论文数:
0
引用数:
0
h-index:
0
机构:
Dokuz Eylul Univ, Turkey
Dokuz Eylul Univ, Turkey
Ozis, U.
[
1
]
Basmaci, E.
论文数:
0
引用数:
0
h-index:
0
机构:
Dokuz Eylul Univ, Turkey
Dokuz Eylul Univ, Turkey
Basmaci, E.
[
1
]
Harmancioglu, N.
论文数:
0
引用数:
0
h-index:
0
机构:
Dokuz Eylul Univ, Turkey
Dokuz Eylul Univ, Turkey
Harmancioglu, N.
[
1
]
机构
:
[1]
Dokuz Eylul Univ, Turkey
来源
:
International Water Power and Dam Construction
|
1990年
/ 42卷
/ 09期
关键词
:
Hydroelectric Station - Rockfill Dam;
D O I
:
暂无
中图分类号
:
学科分类号
:
摘要
:
引用
收藏
页码:12 / 16
相关论文
共 50 条
[21]
SUNSHINE SKYWAY NEARS COMPLETION
GARCIA, AM
论文数:
0
引用数:
0
h-index:
0
GARCIA, AM
ROBISON, R
论文数:
0
引用数:
0
h-index:
0
ROBISON, R
CIVIL ENGINEERING,
1986,
56
(11):
: 32
-
35
[22]
Holly Hill nears completion
World Cement,
2004,
35
(04):
: 67
-
68
[23]
Pedrogao nears completion in Portugal
Maia, M.C.
论文数:
0
引用数:
0
h-index:
0
机构:
EDP Produção, Portugal
Maia, M.C.
Silva, Matos, D.
论文数:
0
引用数:
0
h-index:
0
机构:
EDP Produção, Portugal
Silva, Matos, D.
International Journal on Hydropower and Dams,
2006,
13
(05):
: 80
-
83
[24]
Lufkin conversion nears completion
Anon
论文数:
0
引用数:
0
h-index:
0
Anon
Pulp and Paper,
2001,
75
(05):
[25]
IDCORS WORK NEARS COMPLETION
不详
论文数:
0
引用数:
0
h-index:
0
不详
NUCLEAR ENGINEERING INTERNATIONAL,
1987,
32
(392):
: 25
-
25
[26]
Cyanide code nears completion
Anon
论文数:
0
引用数:
0
h-index:
0
Anon
2002,
Primedia Intertec Publishing Corp.
(203):
[27]
Sultartangi nears completion in Iceland
Wilhelmsson, P.
论文数:
0
引用数:
0
h-index:
0
机构:
Skanska Int Civil Engineering AB, Sweden
Skanska Int Civil Engineering AB, Sweden
Wilhelmsson, P.
Eriksson, S.
论文数:
0
引用数:
0
h-index:
0
机构:
Skanska Int Civil Engineering AB, Sweden
Skanska Int Civil Engineering AB, Sweden
Eriksson, S.
Jonsson, B.
论文数:
0
引用数:
0
h-index:
0
机构:
Skanska Int Civil Engineering AB, Sweden
Skanska Int Civil Engineering AB, Sweden
Jonsson, B.
International Journal on Hydropower and Dams,
1999,
6
(05):
: 38
-
40
[28]
Cyanide code nears completion
不详
论文数:
0
引用数:
0
h-index:
0
不详
E&MJ-ENGINEERING AND MINING JOURNAL,
2002,
203
(04):
: 11
-
12
[29]
Techno Superliner nears completion
不详
论文数:
0
引用数:
0
h-index:
0
不详
NAVAL ARCHITECT,
2005,
: 52
-
52
[30]
World tower nears completion
Cummings, June
论文数:
0
引用数:
0
h-index:
0
Cummings, June
Engineers Australia,
2004,
76
(07):
: 30
-
31
←
1
2
3
4
5
→