NEW SOURCE PERFORMANCE STANDARDS FOR INDUSTRIAL BOILERS.

被引:0
|
作者
Sedman, C.B.
机构
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Boiler firing
引用
收藏
相关论文
共 50 条
  • [21] HOT WATER BOILERS.
    Holzhauer, Ron
    Plant Engineering (Barrington, Illinois), 1987, 41 (10): : 34 - 38
  • [22] NEW CONDENSATE POLISHING TECHNIQUE FOR MEDIUM PRESSURE BOILERS.
    Nitti, Nicholas
    Industrial water engineering, 1980, 17 (06): : 27 - 30
  • [23] New general police regulations on the setting up of boilers.
    Bach, C
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1905, 49 : 111 - 116
  • [24] NEW SOURCE PERFORMANCE STANDARDS
    JENKINS, RE
    MCCUTCHE.GD
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 1972, 6 (10) : 884 - &
  • [25] Average Seasonal Efficiency of Boilers.
    Anglesio, Paolo
    Fracastoro, Gian Vincenzo
    Termotecnica Milano, 1986, 40 (04): : 55 - 62
  • [26] HOW TO SELECT PACKAGE BOILERS.
    Buffington, Milton A.
    Chemical Engineering (New York), 1975, 82 (23): : 98 - 106
  • [27] Heating tube for locomotive boilers.
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1921, 65 : 1044 - 1044
  • [28] STACK SAMPLING FOR SMALL BOILERS.
    Schranze, Benjamin A.
    Instruments and Control Systems, 1978, 51 (11): : 33 - 35
  • [29] DESIGN OF COAL FIRED BOILERS.
    Sur, G.N.
    Rivista dei combustibili, 1979, 33 (7-8): : 229 - 246
  • [30] SURVEY AND REPAIR OF MARINE BOILERS.
    Blacklock, W.T.
    Transactions - Institute of Marine Engineers, (Series) TM, 1980, 19 (pt 13 pap 15): : 209 - 234