CONSTRUCTION OF LARGE PRESTRESSED CONCRETE GIRDERS

被引:0
|
作者
Mustard, J.Neil
Ghosh, Ram S.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The main function of the girders (Bruce Nuclear Power Station) located at the top of the reactor tower is to support the boilers, steam drums, piping and pumps, and at the same time the girders need to be crack free to serve as radiation shields. Each girder had a clear span of 92 ft, was fixed at both ends and post- tensioned. They were 42 ft deep, 6 ft wide, cast continuously from bottom to top, and contained about 1,000 cu yd of concrete. In a semimass structural concrete of this dimension, the cement content is generally high, resulting in high internal temperature. With time, cooling takes place, and if the girder is restrained at both ends, stresses will develope that could cause cracking. This paper examines the way in which these stresses due to thermal cooling have been minimized in practice.
引用
收藏
页码:507 / 519
相关论文
共 50 条
  • [21] Post-Damage Repair of Prestressed Concrete Girders
    Ramseyer, Chris
    Kang, Thomas H. -K.
    INTERNATIONAL JOURNAL OF CONCRETE STRUCTURES AND MATERIALS, 2012, 6 (03) : 199 - 207
  • [22] Shear Cracking of Prestressed Girders with High Strength Concrete
    Emad L. Labib
    Y. L. Mo
    Thomas T. C. Hsu
    International Journal of Concrete Structures and Materials, 2013, 7 : 71 - 78
  • [23] Evaluating fire resistance of prestressed concrete bridge girders
    Zhang, Gang
    Kodur, Venkatesh
    Hou, Wei
    He, Shuanhai
    STRUCTURAL ENGINEERING AND MECHANICS, 2017, 62 (06) : 663 - 674
  • [24] Analysis of Shear Capacity of Prestressed Concrete Bridge Girders
    Park, M-K
    Lantsoght, E. O. L.
    Garnica, G. I. Zarate
    Yang, Y.
    Sliedrecht, H.
    ACI STRUCTURAL JOURNAL, 2021, 118 (06) : 75 - 89
  • [25] Shear Lag Analysis in Prestressed Concrete Box Girders
    Zhou, Shi-Jun
    JOURNAL OF BRIDGE ENGINEERING, 2011, 16 (04) : 500 - 512
  • [26] DYNAMIC AND FATIGUE RESPONSES OF PRESTRESSED CONCRETE GIRDERS WITH OPENINGS
    KENNEDY, JB
    CHAMI, S
    GRACE, NF
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1990, 17 (03) : 460 - 470
  • [27] Shear design of high strength concrete prestressed girders
    Labib E.L.
    Dhonde H.B.
    Hsu T.T.C.
    Mo Y.L.
    Frontiers of Structural and Civil Engineering, 2014, 8 (4) : 373 - 387
  • [28] Pullout capacity of non-prestressed bent strands for prestressed concrete girders
    Noppakunwijai, P
    Jongpitakseel, N
    Ma, ZG
    Yehia, SA
    Tadros, MK
    PCI JOURNAL, 2002, 47 (04): : 90 - 103
  • [29] Post-Damage Repair of Prestressed Concrete Girders
    Chris Ramseyer
    Thomas H.-K. Kang
    International Journal of Concrete Structures and Materials, 2012, 6 : 199 - 207
  • [30] Behaviour of double prestress system in prestressed concrete girders
    Kim, Choong Eon
    Kim, Jae Kwan
    Kim, Jin Kook
    MAGAZINE OF CONCRETE RESEARCH, 2013, 65 (14) : 855 - 864