COMMISSIONING TESTS IN A NUCLEAR POWER STATION.

被引:0
|
作者
Gubser, H.R.
Brom, B.
Weehuizen, F.
Troesch, R.
机构
来源
| 1600年 / 60期
关键词
D O I
暂无
中图分类号
TL48 []; TM623 [核电厂(核电站)];
学科分类号
摘要
Careful planning, operation and systematic carrying out and evaluation of all tests involved in commissioning are essential for the future safety and reliability of a nuclear power station. The various aspects of commissioning tests are discussed using Muehleberg nuclear power station as an example.
引用
收藏
相关论文
共 50 条
  • [21] Regulation of the commissioning of the Sizewell B nuclear power station
    Nuclear Installations Inspectorate, Merseyside, United Kingdom
    Nuclear Energy, 1997, 36 (05): : 351 - 354
  • [22] COMMISSIONING OF UNIT A OF BIBLIS NUCLEAR-POWER STATION
    RITTER, M
    WIENKEN, P
    KERNTECHNIK, 1975, 17 (04) : 168 - 177
  • [23] The regulation of the commissioning of the Sizewell B nuclear power station
    Hutton, WWA
    Rae, AC
    NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 1997, 36 (05): : 351 - 354
  • [24] NEW REACTOR RECIRCULATION LOOPS FOR MUEHLEBERG NUCLEAR POWER STATION.
    Pauli, W.
    Sulzer Technical Review, 1987, 69 (02): : 26 - 30
  • [25] Experience With the Commissioning and Operation of Supercritical Boiler No. 18 at Mannheim Central Power Station.
    Schlessing J.
    Strasser, P.
    VGB-Kraftwerkstechnik, 1985, 65 (11): : 1000 - 1011
  • [26] VERIFICATION AND TESTS OF NUCLEAR POWER STATION
    CORDELLE, F
    ENERGIE NUCLEAIRE PARIS, 1967, 9 (01): : 21 - &
  • [27] PHOTOPROFILING AT DINORWIG POWER STATION.
    Waite, I.
    Wendt, C.M.
    1978, 42 (02):
  • [28] The Iller Valley Power Station.
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1923, 67 : 443 - 443
  • [29] Control Engineering in a Power Station.
    Riedel, Dieter
    Zimmermann, Heinrich
    Brennstoff-Waerme-Kraft, 1984, 36 (12): : 495 - 498
  • [30] Solid Lubricants in the Power Station.
    Gaensheimer, Josef
    Elektrizitatswirtschaft, 1982, 81 (17-18): : 568 - 573