Risk lifecycle and risk relationships on construction projects

被引:1
|
作者
Ren, H.
机构
关键词
D O I
10.1016/0263-7863(94)90012-4
中图分类号
学科分类号
摘要
(Edited Abstract)
引用
收藏
页码:68 / 74
相关论文
共 50 条
  • [41] Risk assessment methodology for underground construction projects
    Choi, HH
    Cho, HN
    Seo, JW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 258 - 272
  • [42] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [43] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS - DISCUSSION
    BARNES, M
    NORMAN, A
    BUTLER, RJ
    CORRIE, RK
    PERRY, JG
    HAYES, RW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 757 - 764
  • [44] Sustainability risk assessment in mega construction projects
    Coskun, Cansu
    Dikmen, Irem
    Birgonul, M. Talat
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (05) : 700 - 718
  • [45] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437
  • [46] Risk management system model for construction projects
    Titarenko, Boris
    Hasnaoui, Amir
    Titarenko, Roman
    XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [47] A Study on Risk of Durability Failure for Construction Projects of Tunnels and Underground Projects
    Pan, Hongke
    Zhang, Zhongguo
    Yang, Linde
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 3280 - 3284
  • [48] Integrated scalar and vector method for fire risk assessment of lifecycle construction
    Rey, E.
    Aguayo, F.
    Peralta, Ma E.
    Lama, J. R.
    Avila, Ma J.
    INFORMES DE LA CONSTRUCCION, 2015, 67 (539)
  • [49] Risk Management of Construction Projects Based on Sandpile Model: a Frame of Risk Conduction
    Xu, B. B.
    Chen, Y. Q.
    Wang, C. M.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1530 - 1534
  • [50] Methodology and tools for risk evaluation in construction projects using Risk Breakdown Structure
    Rasool, Mehdizadeh
    Franck, Taillandier
    Denys, Breysse
    Halidou, Niandou
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2012, 16 : S78 - S98