INTEGRATED SYSTEM PROVIDES SIMULTANEOUS BURN-IN AND TESTING.

被引:0
|
作者
Berris, Jim [1 ]
机构
[1] Kineticon Inc, West Palm Beach, FL,, USA, Kineticon Inc, West Palm Beach, FL, USA
来源
Evaluation Engineering | 1986年 / 25卷 / 12期
关键词
ENVIRONMENTAL TESTING - INTEGRATED CIRCUIT TESTING - Environmental Impact - PRINTED CIRCUITS - Testing;
D O I
暂无
中图分类号
学科分类号
摘要
Historically, the burn-in process has been considered the sweatshop segment of backend integrated circuit production. Dedicated chambers have created bottlenecks in production flow. Batch loading and unloading have caused board mix-ups, significant downtime of capital equipment and unfavorable working conditions. Along with these problems is the reality burn-in takes a long time. Traditional system design constraints provide very little scope for lessening this time or for providing adequate information about device behavior under environmental stress. Many specific drive circuits currently under development are discussed which involve the test and monitoring of devices during burn-in.
引用
收藏
页码:73 / 75
相关论文
共 50 条
  • [41] Burn-in acceleration considerations in 90nm system LSI
    Wakai, Nobuyuki
    Kobira, Yuji
    Oishi, Tamotsu
    Yamasaki, Shinichi
    Egawa, Hidemitsu
    2006 IEEE INTERNATIONAL INTEGRATED RELIABILITY WORKSHOP, FINAL REPORT, 2006, : 171 - +
  • [42] PRODUCTION SYSTEM FACILITATES BARE-DIE TEST AND BURN-IN
    MALINIAK, D
    ELECTRONIC DESIGN, 1994, 42 (17) : 36 - +
  • [43] Electrified track system helps simplify burn-in test procedures
    Slack, Laurie J.
    Electronic manufacturing, 1988, 34 (11):
  • [44] Bounding the optimal burn-in time for a system with two types of failure
    Cha, JH
    Lee, S
    Mi, J
    NAVAL RESEARCH LOGISTICS, 2004, 51 (08) : 1090 - 1101
  • [45] Burn-in failures and local region yield: An integrated yield-reliability model
    Barnett, TS
    Singh, AD
    Nelson, VP
    19TH IEEE VLSI TEST SYMPOSIUM, PROCEEDINGS, 2001, : 326 - 332
  • [46] Burn-in test system of motor controller based on PWM rectifier
    Pan, Z.-P., 1600, Editorial Department of Electric Machines and Control (17):
  • [47] VERIFICATION OF SYSTEM INTEGRITY BY SEQUENTIAL TESTING.
    Anon
    IBM technical disclosure bulletin, 1986, 28 (09): : 3864 - 3865
  • [49] On testing whether burn-in is required under the long-run average cost
    Mohammadi, Faezeh
    Izadi, Muhyiddin
    Lai, Chin-Diew
    STATISTICS & PROBABILITY LETTERS, 2016, 110 : 217 - 224
  • [50] Resonance Voltage System for Capacitor Testing.
    Hajek, Milos
    Elektrotechnicky obzor, 1988, 77 (05): : 263 - 267