共 50 条
- [31] Plant-wide Optimization of a Full-Scale Activated Sludge Plant with Anaerobic Sludge Treatment IFAC PAPERSONLINE, 2015, 48 (08): : 1234 - 1239
- [33] INFLUENCING PARAMETERS ON THE NITRIFICATION-DENITRIFICATION PERFORMANCE OF A SINGLE STAGE ACTIVATED-SLUDGE PLANT PROGRESS IN WATER TECHNOLOGY, 1980, 12 (05): : 551 - 563
- [34] Robust Control of Nitrification Process in Activated Sludge Treatment Plant using Quantitative Feedback Theory IFAC PAPERSONLINE, 2022, 55 (01): : 76 - 81
- [36] Mathematical Modelling and Control for an Activated Sludge Process in a Wastewater Treatment Plant 2019 20TH INTERNATIONAL CARPATHIAN CONTROL CONFERENCE (ICCC), 2019, : 803 - 808
- [37] Artificial Neural Network Ensembles in Hybrid Modelling of Activated Sludge Plant INTELLIGENT SYSTEMS'2014, VOL 1: MATHEMATICAL FOUNDATIONS, THEORY, ANALYSES, 2015, 322 : 683 - 694
- [38] THE IMPACT OF SELECTOR OPERATION ON ACTIVATED-SLUDGE SETTLEABILITY AND NITRIFICATION - PILOT-SCALE RESULTS JOURNAL WATER POLLUTION CONTROL FEDERATION, 1989, 61 (01): : 66 - 72
- [39] NITRIFICATION IN POWDERED-ACTIVATED CARBON-ACTIVATED SLUDGE PROCESS JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1987, 113 (06): : 1285 - 1301
- [40] CONTROL OF NITRIFICATION IN THE OXYGEN ACTIVATED-SLUDGE PROCESS PROGRESS IN WATER TECHNOLOGY, 1980, 12 (05): : 497 - 519