KIDATU POWERPLANT, TANZANIA.

被引:0
|
作者
Reinius, E.
Steby, B.
机构
来源
| 1600年 / 28期
关键词
SPILLWAYS;
D O I
暂无
中图分类号
学科分类号
摘要
The hydroelectric power plant described has a capacity of 100 MW, will eventually be uprated to 200 MW, and will make a substantial contribution to the Tanzanian power supply. Extensive model tests for the spillway, and the use of locally made cement are two of the features of this recently-completed project.
引用
收藏
相关论文
共 50 条