共 50 条
- [22] DRY GAS CLEANING SYSTEM FOR BIOMASS GASIFICATION POWER GENERATION (PERFORMANCE VERIFICATION BY TESTS WITH PILOT PLANT AND FEASIBILITY EVALUATION) PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 1, 2009, : 231 - 236
- [23] MIXER PERFORMANCE DATA FROM PILOT PLANTS INDUSTRIAL AND ENGINEERING CHEMISTRY, 1945, 37 (05): : 422 - 425
- [24] Application of Upgrading Curves for Evaluation of Past, Present, and Future Performance of a Separation Plant MINERAL PROCESSING AND EXTRACTIVE METALLURGY REVIEW, 2010, 31 (03): : 165 - 175
- [26] Probabilistic Flow Duration Curves for Small Hydro Plant Design and Performance Evaluation Water Resources Management, 2008, 22 : 509 - 523