Connection between the bump number problem and flow-shop scheduling with precedence constraints

被引:0
|
作者
机构
[1] Steiner, G.
来源
Steiner, G. | 1600年 / 20期
关键词
Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] A discrete Jaya algorithm for permutation flow-shop scheduling problem
    Mishra, Aseem K.
    Pandey, Divya
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020, 11 (03) : 415 - 428
  • [22] Hybrid Flow-Shop Scheduling Problem Based on Genetic Algorithm
    Rong, Zhang
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, MACHINERY AND ENERGY ENGINEERING (MSMEE 2017), 2017, 123 : 1703 - 1706
  • [23] Inverse scheduling: two-machine flow-shop problem
    Peter Brucker
    Natalia V. Shakhlevich
    Journal of Scheduling, 2011, 14 : 239 - 256
  • [24] A GREEDY ALGORITHM FOR MULTIOBJECTIVE FUZZY FLOW-SHOP SCHEDULING PROBLEM
    Engin, Orhan
    Yilmaz, M. Kerim
    Akkoyunlu, M. Cabir
    Baysal, M. Emin
    Sarucan, Ahmet
    UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 189 - 194
  • [25] Hybrid Flow-shop Scheduling Problem Based on Saving Energy
    Liu Xiang
    Zou Fengxing
    Zhang Xiangping
    Gao Zheng
    PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 7, 2008, : 48 - 53
  • [26] Inverse scheduling: two-machine flow-shop problem
    Brucker, Peter
    Shakhlevich, Natalia V.
    JOURNAL OF SCHEDULING, 2011, 14 (03) : 239 - 256
  • [27] Sevast'yanov's algorithm for the flow-shop scheduling problem
    Sch. Operations Res. Indust. Eng., Cornell University, Ithaca, NY 14853, United States
    不详
    Eur J Oper Res, 1 (176-189):
  • [28] On a Flow-Shop Scheduling Problem with Fuzzy Pentagonal Processing Time
    Alharbi, Majed G.
    El-Wahed Khalifa, Hamiden Abd
    JOURNAL OF MATHEMATICS, 2021, 2021
  • [29] An Estimation of Distribution Algorithm for Permutation Flow-Shop Scheduling Problem
    Lemtenneche, Sami
    Bensayah, Abdallah
    Cheriet, Abdelhakim
    SYSTEMS, 2023, 11 (08):
  • [30] A flow-shop problem formulation of biomass handling operations scheduling
    Bochtis, D. D.
    Dogoulis, P.
    Busato, P.
    Sorensen, C. G.
    Berruto, R.
    Gemtos, T.
    COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2013, 91 : 49 - 56