PLANNING AND TECHNICAL LAYOUT OF BUCKET WHEEL EXCAVATORS FOR LARGE OPEN PIT MINES.

被引:0
|
作者
Hoffman, Dieter [1 ]
机构
[1] O & K Orenstein & Koppel AG, Luebeck, West Ger, O & K Orenstein & Koppel AG, Luebeck, West Ger
来源
Journal of Mines, Metals and Fuels | 1985年 / 34卷 / 04期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:197 / 203
相关论文
共 50 条
  • [41] An interpretation model for measurement while drilling in large open pit mines
    Kou, SQ
    Turtola, H
    Lindqvist, PA
    EXPLOSIVES & BLASTING TECHNIQUE, 2000, : 415 - 421
  • [42] FAILURES OF FRONT-WHEEL SPINDLES OF LARGE HAULAGE TRUCKS AT OPEN-PIT MINES IN B. C.
    Saxon, Rodney T.
    Transactions of the Canadian Institute of Mining and Metallurgy and of the Mining Society of Nova Scotia, 1977, (N S): : 127 - 128
  • [43] Stochastic strategic planning of open-pit mines with ore selectivity recourse
    Navarra, A.
    Montiel, L.
    Dimitrakopoulos, R.
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2018, 32 (01) : 1 - 17
  • [44] Long term production planning of open pit mines by ant colony optimization
    Shishvan, Masoud Soleymani
    Sattarvand, Javad
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (03) : 825 - 836
  • [45] Long Term Planning In Open Pit Mines In Presence Of Commodity Price Uncertainty
    Rahmanpour, M.
    Osanloo, M.
    PROCEEDINGS OF THE 24TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, IMCET 2015, 2015, : 660 - 667
  • [46] Kinematic Features of Scooping Blown-up Rock by Single-Bucket Open-Pit Mine Excavators.
    Kubachek, V.R.
    Desov, I.S.
    Devyatkin, Yu.A.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 1973, (08): : 85 - 92
  • [47] SELECTING DESIGN CAPACITY OF POWER UNITS FOR THE TRACTION ELECTRIC DRIVES OF HEAVY ELECTRIC TRUCKS FOR OPEN-PIT MINES.
    Prolygin, A.P.
    Soviet electrical engineering, 1979, 50 (10): : 52 - 57
  • [48] TECHNICAL PARAMETERIZATION OF RESERVES FOR OPEN-PIT DESIGN AND MINE PLANNING
    COLEOU, T
    21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 485 - 494
  • [49] HYBRID REASONING FOR MULTI-ROBOT DRILL PLANNING IN OPEN-PIT MINES
    Mansouri, Masoumeh
    Andreasson, Henrik
    Pecora, Federico
    ACTA POLYTECHNICA, 2016, 56 (01) : 47 - 56
  • [50] Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
    Xu, Changyou
    Chen, Gang
    Lu, Huabo
    Zhang, Qiuxia
    Liu, Zhengke
    Bian, Jing
    MATHEMATICS, 2024, 12 (13)