Engineering geological evaluation of Yangluo Yangtze bridge, Wuhan

被引:0
|
作者
Liu, Z. [1 ]
Wang, Y. [1 ]
机构
[1] Commun. Lay. Des. Acad. Hubei Prov., Wuhan 430051, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The main engineering problems were represented in the paper: developing faults, fold strata and unclear belt of Xiangfan-Guangji fracture. In elementary period, comprehensive geological methods were applied in the exploration of the bridge site at the same depth for different samples. As a result, no belt of Xiangfan-Guangji fracture was prospected, and only two faults were found at K80+ 530 m and K81+860 m. The F1 fault of them had a great influence on the three-tower rope scheme, while the F2 fault in the south bridge approach had little. So, the scheme of rope bridge was better if only geological conditions were considered. If the sample of stiff bridge was selected, the middle tower must be moved to the south.
引用
收藏
页码:385 / 387
相关论文
共 50 条
  • [21] Engineering Geological Problems of Levee Along Middle and Lower Reaches of Yangtze River
    MA GuishengSenior Engineer Comprehensive Reconnaissance Bureau Changjiang Water Resources Commission Wuhan China
    人民长江, 2002, (S1) : 74 - 77
  • [22] Aseismatic performance evaluation of Yibin Yangtze River highway bridge
    Li, Xiao-Zhen
    Li, Zhen-Xin
    Li, Jun
    Wei, Xing
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2064 - 2070
  • [23] Seismic safety evaluation of Yibin Yangtze River Highway bridge
    Li, ZX
    Li, J
    Li, XZ
    Guo, FZ
    Cheng, HG
    Zhuang, WL
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1626 - 1633
  • [24] ENGINEERING SOLUTIONS TO GEOLOGICAL PROBLEMS IN THE DESIGN AND CONSTRUCTION OF HUMBER-BRIDGE
    SIMM, KF
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY, 1984, 17 (04): : 301 - 306
  • [25] FORGED BY FLOODS: WUHAN YANGTZE RIVERFRONT PARK
    Grove, Michael
    Zhang Tao
    LANDSCAPE ARCHITECTURE FRONTIERS, 2020, 8 (03) : 130 - 145
  • [26] Evaluation of Engineering Geological Condition in Shanghai Coastal Area
    Shi, Y. J.
    Yan, X. X.
    Wang, J. H.
    Fang, Z.
    Li, B.
    NEW FRONTIERS IN ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2013, : 141 - 144
  • [27] Evacuation Safety Assessment of Wuhan Yangtze River Tunnel
    Fang, Zheng
    Yuan, Jianping
    Lo, Siuming
    Xie, Lilin
    THEORY AND PRACTICE OF RISK ANALYSIS AND CRISIS RESPONSE, PROCEEDINGS, 2008, : 561 - +
  • [28] Research on the engineering geological conditions and stability evaluation of the B2 talus slide at the Jin'an Bridge hydropower station, China
    Liu, Jin
    Wei, Jihong
    Hu, Hao
    Wu, Jimin
    Sun, Shaorui
    Kanungo, Debi Prasanna
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2018, 77 (01) : 105 - 125
  • [29] Research on the engineering geological conditions and stability evaluation of the B2 talus slide at the Jin’an Bridge hydropower station, China
    Jin Liu
    Jihong Wei
    Hao Hu
    Jimin Wu
    Shaorui Sun
    Debi Prasanna Kanungo
    Bulletin of Engineering Geology and the Environment, 2018, 77 : 105 - 125
  • [30] Contribution Factor Analysis of the Wuhan Yangtze River Bridge Deformation Using Sentinel-1A SAR Imagery and In Situ Data
    Wang, Cheng
    Li, Xinyi
    Zhou, Lv
    Qin, Jie
    Ma, Jun
    Luo, Ziyan
    Liu, Lilong
    APPLIED SCIENCES-BASEL, 2023, 13 (21):