Plant safety procedures; Site cleanup; Another ChE dean

被引:0
|
作者
机构
来源
Chemical Engineering Progress | 1997年 / 93卷 / 11期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 39 条
  • [31] Atmospheric dispersion modeling and radiological safety assessment for expected operation of Baiji nuclear power plant potential site
    Saeed, Ismael Mohammed Mohammed
    Saleh, Muneer Aziz Mohammed
    Hashim, Suhairul
    bin Ramli, Ahmad Termizi
    Al-Shatri, Shwan H. H.
    ANNALS OF NUCLEAR ENERGY, 2019, 127 : 156 - 164
  • [32] Use of probabilistic analysis in safety validation of AES-2006 designed for the Novovoronezh nuclear power plant site
    Shvyryaev, Yu. V.
    Morozov, V. B.
    Tokmachev, G. V.
    Baikova, E. V.
    Chulukhadze, V. R.
    Fedulov, M. V.
    ATOMIC ENERGY, 2009, 106 (03) : 155 - 161
  • [33] Use of probabilistic analysis in safety validation of AES-2006 designed for the Novovoronezh nuclear power plant site
    Yu. V. Shvyryaev
    V. B. Morozov
    G. V. Tokmachev
    E. V. Baikova
    V. R. Chulukhadze
    M. V. Fedulov
    Atomic Energy, 2009, 106 : 155 - 161
  • [34] SAFETY CONTAINER FOR 1 150 MW NUCLEAR POWER PLANT - REPORT ON BUILDING SITE NEAR TO BIBLIS-A-RH
    不详
    ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1971, 23 (06): : 122 - &
  • [35] Sustainable plant-wearable sensors for on-site, rapid decentralized detection of pesticides toward precision agriculture and food safety
    Teixeira, Samiris Cocco
    Gomes, Nathalia O.
    Calegaro, Marcelo L.
    Machado, Sergio A. S.
    de Oliveira, Taila Veloso
    Soares, Nilda de Fatima Ferreira
    Raymundo-Pereira, Paulo A.
    BIOMATERIALS ADVANCES, 2023, 155
  • [36] The use of a risk assessment tool based on the Sanitation Safety Planning approach for the improvement of O&M procedures of a wastewater treatment plant in Tanzania
    Frattarola, Andrea
    Domini, Marta
    Sorlini, Sabrina
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2019, 25 (06): : 1463 - 1472
  • [37] Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site
    Cho, Jaehyun
    Han, Sang Hoon
    Kim, Dong-San
    Lim, Ho-Gon
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (08) : 1234 - 1245
  • [38] Multi-unit Level 3 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site
    Kim, Sung-Yeop
    Jung, Yong Hun
    Han, Sang Hoon
    Han, Seok-Jung
    Lim, Ho-Gon
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (08) : 1246 - 1254
  • [39] Ecological factors affecting plant species and travertine deposition in petrifying springs from an Italian 'Natura 2000' site [Fattori ecologici che influiscono sulla deposizione di travertino in sorgenti petrificanti di un sito italiano della rete "Natura 2000"]
    Brusa G.
    Cerabolini B.E.L.
    Botanica Helvetica, 2009, 119 (2): : 113 - 123