共 50 条
- [41] Calculation method for the carrying capacity of the arriving and breaking up system in marshalling yard Zhongguo Tiedao Kexue/China Railway Science, 2010, 31 (03): : 120 - 125
- [42] Modelling and simulation of marshalling yard operation providing semi-continuous speed control COMPUTERS IN RAILWAYS VII, 2000, 7 : 457 - 463
- [43] Optimization Model and Algorithm for Train-to-Yard Assignment at Railway Bidirectional Marshalling Stations Tiedao Xuebao/Journal of the China Railway Society, 2024, 46 (06): : 22 - 35
- [45] Study on train waiting time based on different queue models in joining-yard of marshalling station Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban)/Journal of Liaoning Technical University (Natural Science Edition), 2006, 25 (SIPPL. 2): : 251 - 253
- [46] Steel-yard Planning Support System : Optimizing the Steel-yard Planning and Performance Evaluation with Simulation 2012 12TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS), 2012, : 605 - 609
- [48] Tzannes The Brewery Yard, Central Park A + U-ARCHITECTURE AND URBANISM, 2018, (576): : 134 - 141
- [49] A Q-learning System for Container Marshalling with Group-Based Learning Model at Container Yard Terminals IMECS 2009: INTERNATIONAL MULTI-CONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2009, : 162 - 167